摘要
大沙东保障性住房施工总承包(标段4)工程桩分项工程,地质条件复杂、工期紧、施工难度大,施工过程中通过合理配置机具设备,改进施工工艺,采取有效的管理手段和技术措施,保证桩基工程按期按质完成,取得了良好的效果。
The Dashadong affordable housing construction general contractor(section 4) pile sub-project,with complex geological conditions,tight schedule,construction difficulty features. The construction process through the rational allocation of equipment,effective management tools and technical measures to ensure the foundation project on schedule and according to quality,and achieved good results.
出处
《广东土木与建筑》
2015年第1期29-31,共3页
Guangdong Architecture Civil Engineering
关键词
工程桩
冲孔桩
持力层
成孔
桩混凝土浇筑
常见质量问题预防
pile
punching pile
bearing layer
hole pile
concrete pouring
prevention of common quality problems