摘要
某项目5万m2大面积地下结构底板,板块划分多,单次连续浇筑面积大、浇筑时间长,加上如承台等局部增厚部位,其混凝土施工具有与大体积混凝土相似的特性,为防止开裂渗漏,在施工质量、工期和成本控制方面采取了一系列技术措施,供同行参考。
A project area of 50000 square meters large floor underground structure,multi-segmentation,a single continuous pouring of large,long casting time,such as local thickening plus caps and other parts,which have a large volume concrete construction concrete similar characteristics,to prevent cracking leakage,construction quality,schedule and cost control has taken a series of technical measures for reference.
出处
《广东土木与建筑》
2015年第6期44-46,共3页
Guangdong Architecture Civil Engineering
关键词
地下结构
底板
大面积
混凝土
浇筑控制
防渗