地铁平行换乘站中后建车站施工技术

Construction Technology of Latter Station for Metro Parallel Transfer Interchange
下载PDF
导出
摘要 广州地铁高增站为9号线和3号线的换乘站,地下1层框架结构,站厅层位于地面1层,其中3号线已建成并开通运营,9号线车站为后建车站,基坑支护结构直接利用了3号线站的支护桩,其主体结构有南北两个衔接处需要进行改造,文中介绍了9号线站基坑围护结构体系、基底薄弱地层加固、主体结构改造施工及施工监测等关键施工技术和措施。 Metro station Gaozeng,which contains one underground frame structure level and one concourse level above ground,is a parallel transfer interchange of Metro Line 9 and Line 3 which is in operation. Gaozeng Station for Line 9 is a latter station,which shoring system is continue use of the one of Line 3,and there are two main structure connections joints need to be modified located at north and south. This article is about the construction technology of shoring system for metro station of line 9,ground improvement,main structure modification and monitoring etc..
作者 钟小铟
出处 《广东土木与建筑》 2015年第8期58-61,共4页 Guangdong Architecture Civil Engineering
关键词 换乘站 基坑围护结构体系 主体结构改造 地下连续墙 旋喷桩加固 施工监测 parallel transfer interchange excavation shoring system main structure modification diaphragm wall JGP grouting monitoring
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部