宏城广场综合改造工程基坑南面距离地铁1号线仅8.4m,基坑支护采取地下连续墙形式,选用双轮铣槽机成槽施工。文中介绍双轮铣槽机的工作特性、成槽质量控制以及在地铁旁地下连续墙施工中的应用,为同类工程提供借鉴参考。
The distance from the south pit of Hongcheng Plaza comprehensive reconstruction project to Guangzhou Metro line 1 is just8.4m. The foundation pit applied underground diaphragm wall with the choice of double ringing slotter for digging construction. The work performance and slotting quality control of this machinery and its application in the underground diaphragm wall construction next to the metro was introduced in this paper which provided valuable reference for similar projects.