6SHAO Changyu, LU Yongcheng, DENG Qing'er. 730 m Main Span Combined Highway and Railway Cable-Stayed Bridge[C]// Proceeding of IABSE Symposium Improving Infrastructure Worldwide. Weimar, Germany, 2007.
7同济大学桥梁工程系.上海长江大桥主桥合理刚度值与列车走行性分析研究[R].2005.
8同济大学.苏通长江公路大桥钢箱梁合理构造与受力特性研究报告[R].,2004..
9WU Chong, SU Qingtian. Shear Lag in Plat Steel Box Girder of Cable Stayed Bridge[A]. 3rd International Symposium on Steel Structures[C]. ISSS'05, Seoul,Korea, 2005. 919-922.