合理配置与安装煤炭采制样系统 被引量:3

Rational configuration and installation of coal sampling system
下载PDF
导出
摘要 在煤炭码头皮带输送机煤炭采制样系统的技术准备、选型、制造、安装、调试过程中,采取一系列措施,解决了设备系统复杂、运行条件恶劣等不利条件带来的影响,保证洁净舒适的操作环境,满足使用要求,达到预期效果,对类似项目具有一定借鉴作用。 The influence caused by complication of system and bad operation conditions can be eliminated and a clean and comfortable operation environment can be created by adopting a serious of measurements during the engineering preparation,equipment selection, manufacture, installation, commissioning of belt conveyor coal sampling system for coal terminal. The operating requirements can be satisfied and the desired effect can be achieved. This paper gives enlightenment to similar works.
作者 闫伟 李梦佳
出处 《中国港湾建设》 2017年第7期104-108,共5页 China Harbour Engineering
关键词 煤炭码头 采制样 设备 制作 安装 coal terminal sampling equipment manufacture installation
  • 相关文献

参考文献2

二级参考文献5

  • 1[1]GB/T 19494.1 2004,煤炭机械化采样[S].
  • 2ISO3082:1998铁矿石:取样和制样方法[S].北京:中国标准出版社,1998.
  • 3IS03087:1998铁矿石:交货批水分含量的测定[S].北京:中国标准出版社,1998.
  • 4LS04701:2008铁矿石和直接还原铁:筛分法测定粒度分布[S].北京:中国标准出版社,2008.
  • 5李风贵,张西春.铁矿石检验技术[M].北京:中国标准出版社,2005:17.

共引文献19

同被引文献12

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部