期刊文献+

大跨混凝土斜拉桥成桥状态不闭合因素量化分析 被引量:3

Quantitative Analysis on the Completed State No-Closure Factors of the Long-Span Concrete Cable-Stayed Bridge
原文传递
导出
摘要 采用倒拆—前进分析法确定斜拉桥施工/成桥受力状态时,存在最终成桥状态与合理成桥状态不闭合现象。依托某主跨300m的大跨混凝土斜拉桥,在总结分析斜拉桥倒拆-前进分析不闭合成因基础上,利用Midas/Civil软件建立其倒拆与正装有限元模型,分别开展3个主要的成桥状态不闭合因素(结构体系转换因素、几何非线性因素、收缩徐变因素)的影响程度量化研究。针对各不闭合因素,基于'欧几里得范数',结合MATLAB程序,量化各不闭合因素影响程度。研究表明,收缩徐变效应对300m级大跨混凝土斜拉桥施工不闭合影响程度最大,结构体系转换次之,几何非线性影响最小。三种因素引起的目标状态与最终成桥状态的最大差值均为弯矩,且最大弯矩差值出现的位置均为塔梁固结处。 When the backward-forward analysis method is used to determine the stress state of the cable-stayed bridge during the construction phase and completed stage,there is a phenomenon that the final completed state and the reasonable completed state are not closed.Relying on a long-span concrete cable-stayed bridge with a span of 300 m,based on the summaries of the no-closure of the backwardforward analysis,the finite element software Midas/Civil is used to establish a three-dimensional model.The quantitative study on the three influential factors(the structural system transformation,geometric nonlinearity,shrinkage and creep)is conducted respectively.Based on the Euclid norm,the influential extent of every factor on the stress state is also quantified by the MATLAB software.The study shows that the shrinkage and creep has the most significant impact on the 300 m-span concrete cable-stayed bridge construction in all of the three factors.The structural system transformation is the second greatest influential factor and the geometric nonlinearity is the least.The maximum difference between the reasonable state and the final completed state which the three factors cause is the bending moment.Moreover,the position of the greatest bending moment difference is the tower beam consolidation.
作者 吴月星 严仁章 张博恒 谭书林 王桢 刘增武 WU Yue-xing;YAN Ren-zhang;ZHANG Bo-heng;TAN Shu-lin;WANG Zhen;LIU Zeng-wu(School of Civil Engineering,Chongqing Jiaotong University,Chongqing 400074,China;Chongqing Architectural Design Institute of China,Chongqing 400015,China;CCCC First Highway Consultants Co.Ltd.,Xi'an 710075,China)
出处 《公路》 北大核心 2019年第6期68-77,共10页 Highway
基金 国家重点研发计划项目,项目编号2017YFC0806007 国家自然科学基金青年基金项目,项目编号51708067 重庆市基础科学与前沿技术研究专项项目,项目编号cstc2017jcyjAX0463 重庆交通大学研究生教育创新基金项目,项目编号2018S0108
关键词 大跨混凝土斜拉桥 成桥状态不闭合 结构体系转换 几何非线性 混凝土收缩徐变 分析 long-span concrete cable-stayed bridge no-closure problem of the completed bridge state structural system transformation geometric nonlinearity shrinkage and creep analysis
  • 相关文献

参考文献5

二级参考文献24

共引文献183

同被引文献37

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部