5Huber H, Schwartz J L, Frey R P. Rehabilitation of the devil's bridge over Sehoilenen gorge[J]. StruduraI Engineering International, 2000,10 ( 1 ) : 23- 25.
6Montero A C. Effect of maintaining traffic during widening of bridge decks:a case study[D]. Ohio:Obio State University, 1980.
7Kwan A K H,Ng P L. Reducing damage lo concrete stitches in bridge decks[J]. Proceedings of 1he Institu te of Civil Engineers: Bridge Engineering, 2006, 159(2) :53-62.
8Hilsdorf H K, Lott J I.. Revibration of retarded concrete for continuous bridge decks [R]. Washington DC:National Academy of Sciences, 1970.
9Furr H I., Fouad F H. Effect of moving traffic on fresh concrete during bridge deck widening[J]. Trans portation Research Record, 1982 (86) : 28 -36.
10Ng P L, Kwan A K H. Effects of traffic vibration on curing concrete stitch part II:cracking, debonding and strength reduction [J]. Engineering Structures, 2007, 29(11) :2881-2892.