4TREJO D,PILLAI R G, HUESTE M B D,et al. Pa rameters Influencing Corrosion and Tension Capacity of Post-tensioning Strands[J]. ACI Materials Jour nal,2009,106(2) :144 -153.
5EL ZGHAYAR E, MACKIE K R, HABER Z B, et al. Secondary Anchorage in Post-tensioned Bridge Sys- tems[J]. ACI Structural Journal, 2013,110 (4) : 629 -638.
6WOOD S L, MCKINSTRY C A, LEE J K. Residual Tensile Capacity of Grouted Post-tensioned Tendons[J].ACI Structural Journal, 2013, 110 (6): 1099- 1108.
7LI F M, YUAN Y S. Effects of Corrosion on Bond Behavior Between Steel Strand and Concrete[J]. Con-struction and Building Materials, 2013,38 : 413-422.
8WOUTERS J P,KESNER K,POSTON R W. Tendon Corrosion in Precast Segmental Bridges[J]. Transpor- tation Research Record, 1999,1654 : 128-132.
9OHTSU M, ALVER N. Development of Non-contact SIBIE Procedure for Identifying Ungrouted Tendon Duct[J]. NDT & E International, 2009,42 (2) : 120- 127.
10FRICKER S, VOGEL T. Site Installation and Testing of a Continuous Acoustic Monitoring [J].Construc- tion and Building Materials, 2007,21 ( 3 ) : 501-510.