4Frangopol D M, Lin K Y,Estes A C.Life-cycle costdesign of deteriorating structure[J]. Architectural Engineering,1997:13.
5Kim S,Frangopol D M,Zhu B. Probabilistic OptimumInspection/Repair Planning to Extend Lifetime of DeterioratingStructures[J].Journal of Performance ofConstructed Facilities. 2011,25(6):534-544.