海洋环境下接地电阻的测量

Measurement of Grounding Resistance in Marine Environment
原文传递
导出
摘要 对电力系统中接地电阻的精确测量,能够保证电力设备正常运行。为实现对海洋环境下跨海大桥所属电气设备的接地电阻的准确测量,对跨海大桥所属的电气设备接地的可靠性进行判断。传统的方法需要在土壤中打入辅助电极,不适用于海洋环境。在海洋环境中,通过"三点法"使用钳型接地电阻测试仪对跨海大桥所属电气设备的接地电阻进行测量,数据结果显示"三点法"能够准确反映接地电阻的大小。在港珠澳大桥施工现场,通过"三点法"使用钳型接地电阻测试仪,准确测量了各接地系统的接地电阻。 The accurate measurement of ground resistance in power system can ensure the normal operation of power equipment. In order to realize accurate measurement of grounding resistance of electrical equipment of sea-crossing bridge under marine environment,the grounding reliability of the electrical equipment belonging to the bridge is determined. Traditional method needs to infiltrate the auxiliary electrode into the soil,which is not suitable for marine environment. In marine environment,the grounding resistance of the electric equipment of the cross-sea bridge is measured by clamp type grounding resistance tester with "three point method". The data result shows that the "three-point method"can accurately reflect the amount of the grounding resistance.In the construction site of Hong Kong-Zhuhai-Macao Bridge,the grounding resistance of each grounding system is measured accurately by using the abovementioned grounding tester with "three-point method".
作者 夏文
出处 《公路交通科技》 CAS CSCD 北大核心 2017年第S1期117-120,共4页 Journal of Highway and Transportation Research and Development
关键词 交通工程 接地电阻测量 三点法 海洋环境 可靠性 traffic engineering grounding resistance measuring three-point method marine environment reliability
  • 相关文献

参考文献8

二级参考文献25

  • 1李福寿(Li Fushou).中性点非有效接地电网的运行(Operation for Electrical Power System with Neutral in Effective Grounding)[M].北京:水利电力出版社(Beijing:Hydraulic and Electric Power Press),1993..
  • 2王辛之(Wang Xinzhi).单片机应用系统抗干扰技术(Antijammmg Technique in Applied System of the One-slice Computer)[M].北京:北京航空航天大学出版社(Beijing:Beijing Astronautic &amp, Aeronautic University Press),2000..
  • 3白忠敏 於崇干(Bai Zhongmin Yu Chonggan).电力工程直流系统设计手册(Design Manual for DC Power Supplying Electric Power System)[M].北京:中国电力出版社(Beijing:China Electric Power Press),1999..
  • 4中交公路规划设计院有限公司.港珠澳大桥工程可行性研究报告[R].2008.
  • 5中交公路规划设计院有限公司设计联合体.港珠澳大桥初步设计文件报告[Z].珠海:中交公路规划设计院有限公司设计联合体,2010.
  • 6中国交通建设股份有限公司联合体.港珠澳大桥主体工程岛隧工程西人工岛施工图设计[Z].珠海:中国交通建设股份有限公司联合体,2011.
  • 7中交公路规划设计院有限公司和中交第二航务工程勘察设计院有限公司.港珠澳大桥主体工程详勘地质报告(隧道)[R].珠海:中交公路规划设计院有限公司和中交第二航务工程勘察设计院有限公司,2009.
  • 8中交公路规划设计院有限公司和中交第二航务工程勘察设计院有限公司.港珠澳大桥主体工程初勘地质报告(隧道)[R].珠海:中交公路规划设计院有限公司和中交第二航务工程勘察设计院有限公司,2009.
  • 9上海市政工程设计研究总院咨询联合体.港珠澳大桥初步设计文件咨询审查报告[Z].珠海:上海市政工程设计研究总院咨询联合体,2010.
  • 10Su Quanke, Chen Yue, Li Ying, Mr J C W M (Hans) de Wit. Hong Kong Zhuhai Macao Bridge link in China-stretching the limits of immersed tunnelling [C]. Helsinnki: International Tunnel Association Press, 2011.

共引文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部