摘要
在岭澳核电站金属结构施工过程中 ,实施“满足合同规定要求和持续改进”理念 ,加强了一系列质量管理措施 。
During the construction of metal structure of Ling'ao Nuclear Power Station, the idea of satisfying contract rule and persistent improving were adopted. We accepted a series of quality management measure, so the quality management was ensured.
出处
《施工技术》
CAS
北大核心
2002年第12期34-35,共2页
Construction Technology
关键词
岭澳核电站
金属结构施工
质量管理
nuclear power station
metal structure
qualtiy management