摘要
现行《城市综合管廊工程技术规范》(GB 50838—2015)中没有针对采用盾构法施工的综合管廊的具体技术规定,通过对盾构施工工法及综合管廊的技术特点进行分析,从入廊管线、管廊断面布置、平纵布置、关键节点(盾构综合竖井)及管廊附属系统等方面,对盾构管廊设计要点进行了探讨,可为后续盾构管廊设计和规范完善提供参考。
The current Technical Code for Urban Utility Tunnel Engineering (GB 50838-2015)does not provide specific technical regulations for the shield utility tunnel. By combining the technical characteristics of the shield construction method and the utility tunnel,the design key points of shield utility tunnel were discussed,which included the urban pipeline into the tunnel,the standard crosssection,the plan and vertical section design,the key node (shield comprehensive shaft) and the accessorial facilities of the utility tunnel,etc. The key points of the paper could provide references for the design of following utility tunnel and specification improvement of current utility tunnel code.
作者
仲崇军
李胜
张玉珠
戴超
ZHONG Chong-jun;LI Sheng;ZHANG Yu-zhu;DAI Chao(Guangdong Branch,Beijing General Municipal Engineering Design&Research Institute Co.Ltd.,Guangzhou 510060,China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2019年第2期67-71,78,共6页
China Water & Wastewater
关键词
综合管廊
盾构施工
盾构综合竖井
utility tunnel
shield construction
comprehensive shield shaft