3Joon-Young Park,Jae-Kyung Lee,Ki-Yong Oh,Jun-Shin Lee,Beom-Joo Kim.Design of Simulator for 3MW Wind Turbine and Its Condition Monitoring System. Lecture Notes in Engineering and Computer Science . 2010
4Gertmar L,Liljestrand L,Lendenmann H.Wind Energy Powersthat-be Successor Generation in Globalization[J].IEEE Trans.on Energy Conversion,2007,22(1):13-28.
5张亮.风力发电机组齿轮箱早期故障诊断方法研究[D].大连:大连理工大学,2011.
6祝儒德.风机齿轮箱监测诊断系统的研究与实现[D].哈尔滨:哈尔滨工业大学,2011.
7Park J Y, Lee J K, Oh K Y. Design of simulator for 3MW wind turbine andits condition monitoring system [C ]//Proceedings of the International Mul-ticonference of Engineers and Computer Scientists.Hong Kong, 2010:17-20.
8Diop A. D”Nichita C.,Belhache J. ^.Modelling variable pitch HAWTcharacteristics for a real time wind turbine simulator[ jj.Wind Engineer-ing, 1999,23(4):225-243.