摘要
模拟机引进是一项系统性工程,是在高性能、高可靠性、低成本、低能耗等方面寻求平衡点的工作,也是要做好前期规划的系统工程。合理的规划、严谨的工作流程、超前的意识、良好的执行力都是做好引进工作的前提。本文以空客飞机模拟机为例,阐述引进工作的规划、场地、试飞等环节和关键技术要点。
It has been a common consensus that procurement of the full flight simulator is a critical issue in continuously striking.For a balance in higher performance and reliability, lower cost and energy consumption, the systematic project of pre-planning must be done.In order to better performing procurement, buyers should have responsibilities,including proper planning, compact workflow, advanced awareness and reasonable execution,that can be guaranteed prior to the project milestone. In this paper,we discussed a bit of technical problem, with the author's wide background and experience in the process of procurement Airbus full flight simulators.
出处
《工业技术创新》
2016年第2期136-141,共6页
Industrial Technology Innovation
关键词
飞行模拟机
引进
试飞
关键环节
Flight Simulator
Introduction
Test Flight
Key-link