MZ900S型上行式移动模架过孔控制要点浅析 被引量:1

Analysis of Control Points of MZ900S Uplink Movable Gantry Pass Through
原文传递
导出
摘要 根据白河特大桥箱梁施工实际,51#至72#箱梁施工采用移动模架施工,其所占面积小,施工效率高。本文针对MZ900S型上行式移动模架的移动过孔过程存在的问题,如行走控制环节多、安全风险大的特点,分析了过孔流程步骤,总结了过孔过程中的控制要点和关键细节。结果表明:方法保证了安全平稳的完成过孔工序,有效指导了现场MZS900型上行式移动模架过孔施工。 According to the Bai He Super Large Bridge box girder construction actual, beam construction in the box 51# to 72# with movable gantry construction and the occupied area is small, and of high construction efficiency. MZ900 S uplink movable gantry pass through process, with walking control links,the characteristics of high security risk. Through careful observation learning of holing process steps,detailed summary of the details of the hole in the process control points and the points for attention, to ensure the safe and smooth completion of the hole through procedures, can effectively guide MZ900 S uplink movable gantry pass through construction on-site.
作者 杨鹏 化永胜
出处 《工业技术创新》 2016年第4期779-782,共4页 Industrial Technology Innovation
关键词 MZ900S型移动模架 过孔 关键技术 MZ900S Uplink Movable Gantry Pass Through Main Points
  • 相关文献

参考文献3

二级参考文献11

共引文献8

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部