高填方地基强夯法处理分析研究 被引量:4

STUDY OF DYNAMIC COMPACTION METHOD IN HIGH FILL GROUND
原文传递
导出
摘要 随着经济的发展,建设用地的需求越来越大,高填方场地的开发也越来越多。通过强夯夯击能与规范中的轻型击实试验、重型击实试验的击实功进行对比分析,建议高填方场地强夯地基处理宜选择轻型击实试验作为压实度的控制标准。同时高填方地基处理是一个系统工程,强夯法设计中应综合考虑填料性质、地形、工期及造价等多方面的因素,实现动态化设计和信息化施工。 With the development of economy,the demand of construction land is ever-larger,the development of high fill site is more and more. Compares dynamic compaction tamping with compaction functionality of the light compaction test and the heavy compaction test in the specification,suggested that dynamic compaction treatment should choose the light compaction test as compaction control standard in high fill ground. And,high fill ground treatment is a systems engineering,a variety of factors should be considered in the design of dynamic compaction method,such as filler properties,topography,time limit for a project,cost,etc,to achieve dynamic design and information construction.
作者 陈学
出处 《工业建筑》 CSCD 北大核心 2014年第S1期691-693,758,共4页 Industrial Construction
关键词 高填方地基 击实试验 强夯法 动态化设计 信息化施工 high fill ground compaction test dynamic compaction dynamic design information construction
  • 相关文献

参考文献3

二级参考文献11

共引文献7

同被引文献18

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部