介绍了在青海盐湖地区盐渍土地基处理中使用了换填、干振碎石桩、强夯置换相结合的综合治理措施,为盐渍土地区施工提供了可借鉴的意见。
This paper introduces the salty soil foundation treatment in Qinghai Saline Lake area,in which the comprehensive control measures for filling,dry vibrated gravel pile,dynamic compaction replacement were used,which provide a reference for the construction in saline soil area.