针对既有热卷箱的升级改造工程,在不影响生产的前提下,提出了在线外进行设备的预装、短期停产期间进行设备整体吊装就位的工艺方法,节约大量工期,从而创造可观的经济价值.
For upgrading project of existing hot-coil-box,under the premise of not affecting production,Process method of the pre assembling work outside the line and the integral-hoisting for the equipment during the short-term shutdown is proposed,which saves a lot of time for a project,and creats significant economic benefit.
出处
《工业建筑》
CSCD
北大核心
2014年第S1期1208-1211,共4页
Industrial Construction
关键词
既有设备升级改造
热卷箱
线外预装
整体吊装
upgrading of existing equipment
hot-coil-box
preassemble outside lines