摘要
在系统概化的基础上建立了南水北调东线水量调配模型 ,进行了水量调配计算 ,并进行了仿真试验分析。水量调配结果表明 ,东线工程调度过程合理 ,且具有较高的可靠性。
A water operation model for the east route in South-North Water Diversion Project is established on the basis of systematic finalization; the water distribution in operation is computed and the simulation testing analysis is conducted in this paper. The findings from water operation indicate that the process of engineering operation in the east route is both rational and reliable.
出处
《西安理工大学学报》
CAS
2002年第3期238-243,共6页
Journal of Xi'an University of Technology
基金
国家计委重大科研项目的部分成果
关键词
南水北调东线
水量调配
仿真试验
east route of south-north water diversion project
water operation
simulation test