摘要
水库移民安置点工程地质勘察越来越得到重视,在勘察中需要注意工程地质勘察程序、工程地质勘察工作深度、生活和生产用水调查和库区塌岸等问题,为此以百色水利枢纽一期移民安置点工程地质勘察为例,说明要注意以上几个问题的必要性。
The engineering geologic investigation of the reservoir migration-relocation setting points was paid more and more attention. Several problems due to attend in investigation, which included engineering geologic investigation program, work depth, life and production water_use investigation and reservoir area cave bank, etc. Taking the engineering geologic investigation of 1st stage migration_relocation setting points of the Baise multi_purpose dam project as example, the author discussed the necessity of paying attention to the above problems.
出处
《广西水利水电》
2002年第4期50-52,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水库
移民安置点
工程地质勘察
engineering geologic
investigation
migration_relocation setting points
problems