摘要
介绍了福禄河五级水电站电气主结线的设计。通过一年的运行实践,证明本设计做到了简单清晰、经济合理,设计是成功的。
Introduced the electric main wiring design of the Fuluhe river 5th step hydropower station. Through running practice for one year, the design was proved being simple, clear, economic and reasonable. Design is successful.
出处
《广西水利水电》
2002年第4期76-77,共2页
Guangxi Water Resources & Hydropower Engineering