期刊文献+

古田溪三级大坝垂直位移"突变"分析

Heterogenesis Analysis of Gutianxi Dam's Vertical Displacement
下载PDF
导出
摘要 根据古田溪三级大坝的地质和结构特性,通过三维有限元计算,建立了含有指示变量的混合模型,并利用分离出的时效分量,得出大坝垂直位移变形两次"突变"疑点分别是由左岸沉陷基点基础不稳定和地震等荷载造成的结论,同时证明含有指示变量的混合模型是分析突变成因行之有效的方法。 Based on the characteristic of geology and structure of Gutianxi dam, a compound model involving indicative variable is given through the calculation of three dimensional FEM. By use of the separate time effect component, the reasons causing two doubtful saltation of vertical displacement of this dam are given, one is that the base of settlement base points at left side was instable, the other may be earthquake. At the same time, it is proved that compound model involving indicative variable is a effective method to analyze the reason of mutation.
出处 《水电能源科学》 2002年第4期27-30,共4页 Water Resources and Power
关键词 垂直位移 突变 有限元法 指示变量 混合模型 vertical displacement mutation finite element method indicative variable compound model
  • 相关文献

参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部