摘要 主要介绍三峡工程施工区环境质量监测及其管理的基本情况,并针对监测结果初步分析了工程开工以来主要环境因子的变化情况。分析表明,一期工程主要对空气造成了污染,对长江干流和近岸水质无明显影响;二期工程施工中,空气和水质污染的情况明显好转;预测三期工程活动将在清洁的良好的生态环境中进行。 This paper mainly presents the situation of environmental quality monitoring and control for Three Gorges Project construction areas and tentative analysis of the monitoring results to find out variations of main environmental factors since commencement of the project.The analysis indicates that the first stage works construction would mainly pollute the air and would not evidently affect the water quality of the Yangtz River,during the second stage works construction the pollution of the air and the river water will significantly mitigated and it is expected construction of the third stage works will be carried out in a clean and good ecological environment.
出处 《水电站设计》 2002年第4期5-9,共5页 Design of Hydroelectric Power Station
关键词 三峡工程 环境监测 施工区 环境污染 Three Gorges Project environmental monitoring construction area environmental pollution
  • 相关文献

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部