三峡左岸电站厂房施工设计概述

Construction Design of Three Gorges Left Powerhouse
下载PDF
导出
摘要 三峡左岸电站厂房属坝后引水式厂房。机组为立轴混流式,单机容量700 MW,总装机容量9 800 MW。电站厂房共设14台机组、3个安装场,总长643.7 m,底宽68 m,最大高度93.8 m,机组中心距38.3 m,主厂房上下游平台高程82 m;上游副厂房宽17 m,高40 m,总长619.8 m;尾水平台宽19.5 m,尾水渠宽580~310 m.渠底高程29.9~50 m。高程67 m以下为大体积结构,高程67 m以上为钢筋混凝土薄壁结构。三峡左岸电站厂房规模宏大,施工工序繁杂,要求的施工工期紧张,切实做好施工设计,是保障其有序施工和按期投产的先决条件。 The Three Gorges left powerhouse located at the left dam toe is of a diversion type, has a total installed capacity of 9 800 MW and 14 vertical shaft turbines of 700 MW each. The powerhouse has a total length of 643. 7 m, a bottom width of 68 m and a maximum height of 93. 8 m, with 3 erection bays. The central space is 38. 3 m between turbines, and the elevation of the up-and downstream platforms for the main powerhouse is 82 m; the upstream auxiliary powerhouse has a width of 17 m and height of 40 m, with a total length of 619. 8 m; the tailwater platform has a width of 19. 5 m, and the tailrace canal has a width of 580-310 m and bottom elevation of 29. 9-50 m. The powerhouse is composed of massive structures below elevation 67 m and thin reinforced concrete structures above elevation 67 m. The construction sequences for the powerhouse are very complicated as a result of its huge size and tight time requirements. A good construction design, therefore, could be the prerequisite to ensure an orderly construction and operation on schedule.
出处 《中国三峡建设》 2002年第12期6-7,共2页 China Three Gorges Construction
关键词 三峡左岸电站 厂房 设计 概述 施工进度 机组 引水式厂房 薄壁结构 Three Gorges project powerhouse construction progress civil wprks unit.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部