摘要
通过复式挑流鼻坎在公伯峡水电站整体水工模型试验中的应用情况 。
The application of complex deflecting bucket in Gongboxia hydropower project's hydraulic model test has demonstrated that the complex deflecting bucket has good effects for reducing bank scouring depth and downstream deposition elevation.
出处
《西北水电》
2002年第4期39-43,共5页
Northwest Hydropower
关键词
复式挑流鼻坎
公伯峡水电站
水工模型
消能
防冲
complex deflecting bucket
hydraulic model
energy dissipation and scouring protection