摘要
利用拟合平面二维水流数学模型 ,分析研究了哈达山水利枢纽建成后 ,下泄 2 5 0m3 /s流量方案对扶余至三岔河口河段通航条件的影响 。
The influence of water discharge(250 m 3/s)on navigation condition of the reach from Fuyu to Sanchahe kou after the completion of Hadashan Hydro junction Project is studied based on the two dimensional flow mathematical model of fitting plane.And the regulation measures are proposed.
出处
《水道港口》
2001年第4期164-168,共5页
Journal of Waterway and Harbor