摘要
根据深圳地铁一期工程主变电站设计思想,分析了地铁主变电站设计选择先进的、可靠的一、二次设备及综合自动化系统,实现无人值班变电站。
According the main points of the design of the main substation in the course of the first stage's project for shenzhen subway, analyzed the design, chose advanled. dependoble first, second device and comprehensive automatic system, realized cenmaned substation.
出处
《铁道机车车辆》
2001年第6期28-30,共3页
Railway Locomotive & Car