Construction of Chinese—Kazak copperative oil pileline kicks off
-
1Zhou Yanhong.Growing Pains Felt as New Gas Prizing Mechanism Kicks in[J].China Oil & Gas,2013,20(3):50-52.
-
2金玉其中——SWD SWEDEN KICKS[J].中国服装(北京),2009(13):118-119.
-
3IN BRIEF[J].China Oil & Gas,2004,11(3):62-63.
-
4Bo Min,Xu Enxin,Jin Ruihuan,Peng Nian.Analysis of Drilling Troubles in Kazhdumi Formation of Yadavaran Oilfield, Iran[J].China Oil & Gas,2015,22(2):21-25.
-
5王志远,孙宝江.Deepwater gas kick simulation with consideration of the gas hydrate phase transition[J].Journal of Hydrodynamics,2014,26(1):94-103. 被引量:8