摘要
石砭峪水库是定向爆破筑坝,该工程除险加固需要对安全监测系统进行更新改造,其观测项目及监测自动化系统具有典型性。
The dam of Shibianyu reservoir is constructed by directed blasting. It is needed the dam safety monitoring system to be improved and renovated. The observation items and the monitoring system automation have typical meaning in hydraulic engineering.
出处
《西北水力发电》
2002年第4期37-39,共3页
Journal of Northwest Hydroelectric Power
关键词
加固工程
石砭峪水库
安全监测
更新改造
Shibianyu Reservoir
safety monitoring
improvement and renovation