摘要
四川水电目前处于开发高峰期,雅安-武汉特高压输电工程投产将提升四川水电外送能力。本文从电力供需、电网安全等角度展开该工程对湖北电网的影响研究,并提出相关电网改造措施和建议。
At present Sichuan hydropower is expanding,the capacity of Sichuan hydropower delivery will be enhanced after the UHV transmission project from Ya'an to Wuhan is put into operation.The paper assesses the impact of UHV operation on Hubei power grid from the perspective of power supply and demand,power grid security,and then proposed some rehabilitation measures and recommendations.
出处
《湖北电力》
2013年第6期13-15,18,共4页
Hubei Electric Power
关键词
特高压输电工程
四川水电
湖北电网
电网规划
UHV transmission project
Sichuan hydropower
Hubei power grid
grid planning