摘要
本文以雅安-武汉交流特高压工程穿越长江三峡国家级风景名胜区为例,分析阐述特高压工程穿越国家级风景名胜区在项目可研、专题论证、审批流程中要注意的环保问题,为加快类似工程进度、解决工程中类似问题提供参考。
With the Ya'an-Wuhan AC UHV project across the Three Gorges as the research background,the paper discusses the environmental problems caused by the UHV project across the statelevel scenic areas in different stages including project feasibility study,project demonstration and approval process.It can provide a reference to resolve similar problems.
出处
《湖北电力》
2013年第6期32-35,共4页
Hubei Electric Power
关键词
特高压工程
风景名胜区
环境保护
UHV project
scenic areas
environmental protection