220kV恩利线重冰区杆塔选型与设计优化 被引量:1

Design Optimization and Selection of Tower for Heavy Icing Area with 220kV Enshi-Lichuan Transmission Line
下载PDF
导出
摘要 重冰区杆塔因其履冰荷载较大,成为杆塔设计时的主要控制条件。本文以220kV恩利线工程重冰区杆塔为分析对象,介绍了重冰区线路的杆塔规划,详细分析了重冰区杆塔的选型,论述并总结了杆塔结构设计与优化的原则和措施。 When the towers are designed in the heavy icing area,the major controlled condition is the ice loading because of its larger value.This paper takes the towers of the 220 kV Enshi-Lichuan transmission line project in the heavy icing area as an analyzed object.The towers plan in the heavy icing area is introduced,the selection of transmission tower for heavy icing area is analyzed in detail,and the principles and measures for the tower structural design and optimization are discusses and summarizes.
出处 《湖北电力》 2014年第8期33-36,共4页 Hubei Electric Power
关键词 重冰区 杆塔选型 设计优化 heavy icing area transmission tower selection design Optimization
  • 相关文献

参考文献1

共引文献34

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部