摘要
结合水力学模型试验成果,研究确定了大渡河瀑布沟水电站截流戗堤的布置、龙口位置的选择、龙口段和非龙口段的划分、施工进占抛投方式,以及降低截流难度、提高截流抛投强度的工程措施。
The river closure works of Pubugou Hydropower Station on Dadu River is researched in the light of the hydraulic model test result.The closure dyke layout,closure gap positioning,and dividing of closure gap section with non-closure gap section are determined,meanwhile;the measures for reducing closure work difficulty and raising dumping intensity are determined as well.
出处
《水电与新能源》
2008年第3期48-51,共4页
Hydropower and New Energy
关键词
大渡河瀑布沟水电站
截流施工
戗堤
龙口
Daduhe Pubugou Hydropower Station
river closure works
closure dyke
closrue gap