6Ihab Mohammad Hamdi Saad,Donn E.Hancher. Multimedia for Construction Project Management:Project Navigator[J].{H}Journal of Construction Engineering and Management,1998,(02).
7福斯伯格;许江林.可视化项目管理(第3版)[M]{H}北京:电子工业出版社,20069.
8Kyuman Cho,Taehoon Hong,Changtaek Hyun. Integratedschedule and cost model for repetitive construction process [ J ].Journal of Management in Engineering. 2010 ( 26) : 78 -88.
9Emad Elbeltagi,Mahmoud Dawood. Integrated visualized timecontrol system for repetitive construction projects [ J ].Automation in Construction, 2011 (20) : 940 - 953.