摘要
结合御道口500 kV变电站改扩建工程实例,提出电气主接线完善方案,并重新核算现有接地电阻、设备参数、导体(汇流母线、导线)及安全距离等是否满足规程要求,文中提出的方案可供同类型变电站的扩建工程借鉴。
For 500 kV substation expansion projects,some designers mistakenly think demolition of outdated equipments and installations of new equipments are sufficient.In fact this method leads to shortcomings both during and after the expansion project process.This article uses the Yudaokou 500 kV substation expansion project as a case study,and proposes that in the design stage of such projects,the main electric connection to be improved and perfected,the the existing parameters such as grounding resistance,device parameters,conductors(busbar,conductor)and safety distance etc,needs to be re-calculated so that these parameters can meet the code requirement.
作者
丁钰
饶群
马志恩
DING Yu;RAO Qun;MA Zhi'en(North China Power Engineering Co.,Ltd.,Beijing 100120,China;State Grid Hebei Electric Power Research Institute,Shijiazhuang 050021,China;Huaneng Henan Power Sales Co.,Ltd.,Zhengzhou 450018,China)
出处
《河北电力技术》
2019年第3期15-18,62,共5页
Hebei Electric Power
关键词
500
KV变电站
改扩建
电气设备
载流量
接地电阻
500 kV substasion
transformation and expansion project
electrical equipment
current-carrying capacity
earthing resistance