考虑到高压输电线路电气工程往往有着耗时长,规模大且干扰因素较为多样化的特点,要实现对输电稳定性的全面提升,达到可持续发展目标要求,就必须针对高压输电线路电气设计方面所普遍存在的抗冰,路径选择与杆塔基础选择等问题展开深入分析,依据标准设计流程来采取相应的合理设计措施。
Considering that electrical engineering of high-voltage transmission lines often has the characteristics of long time-consuming,large scale and diversified interference factors,in order to achieve an overall improvement of transmission stability and meet the requirements of sustainable development goals,it is necessary to design electrical equipment for high-voltage transmission lines.The problems of anti-ice,path selection and selection of tower foundations are generally analyzed in depth,and corresponding rational design measures are adopted according to the standard design process.This paper mainly analyzes the electrical design of high voltage transmission lines.
作者
张国富
ZHANG Guofu(State Grid Jibei Electric Power Co.,Ltd.Zhangjiakou Power Supply Company,Zhangjiakou 075000,China)
出处
《河北电力技术》
2019年第4期57-59,共3页
Hebei Electric Power
关键词
高压输电线路
电气设计
存在问题
解决措施
high voltage transmission line
electrical design
existing problems
solution