期刊文献+

再论隧道超欠挖的分析与检测 被引量:4

Discussion on analysis and monitoring of over and under-break in tunnelling
下载PDF
导出
摘要 文章对隧道超欠挖问题进行了分析,评价了超欠挖的计算方法,指出了超欠挖对隧道工程的影响,同时介绍了超欠挖的各种检测方法,并把这些方法分为接触式和非接触式两类来阐述,以此作为隧道施工监控和验收的依据。 The problems of over and under - break in tunnelling are analyzed in this paper. Several calculation methods are then listed and evaluated. And various influence on tunnelling caused by over and under - break are presented. The analysis shows that it is essential to monitor and controll the over and under -break. In this paper the monitoring methods of over and under -break are also introduced which are divided into two types:contact and non - contact. It can be taken as the reference for control and acceptance of tunnel construction.
机构地区 北方交通大学
出处 《现代隧道技术》 EI 2001年第6期10-13,共4页 Modern Tunnelling Technology
关键词 隧道超欠挖 检测 横断面 接触式 非接触式 Over and under-break Monitoring Cross-section
  • 相关文献

参考文献5

二级参考文献5

  • 1铁道部二勘测设计院.岩溶工程地质[M].北京:中国铁道出版社,1984..
  • 2-.中华人民共和国北京至珠海国道主干线国道Ⅱ项目粤境高速公路小塘至甘塘段技术规范[M].广东省高速公路公司/交通部第二公路勘察设计院,1998,5..
  • 3按可靠度修订隧规可行性研究课题组.铁路隧道可靠度研究文集[R].成都:西南交通大学,1991.
  • 4R E Melchers.Structural Reliability Analysis and Prediction[M].ELLISHORWOOD.1987.
  • 5Yosh.,KI 王华.隧道开挖中光面爆破的研究[J].隧道译丛,1990(8):22-28. 被引量:1

共引文献22

同被引文献34

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部