交直流一体化电源系统在特高压练塘站的应用 被引量:6

Application of AC/DC Integrated Power System in UHV Liantang Substation
原文传递
导出
摘要 简要分析了特高压练塘变电站交直流一体化电源系统现状及存在问题,主要包括电源的自动切换、启动、连续供电及安全可靠性问题等。通过对比500 kV变电站的交直流电源系统,介绍了特高压变电站交直流一体化电源系统的主要特点,并根据系统特点及结构原理阐述了特高压变电站交直流一体化电源系统设计的优越性和可靠性。 This paper generally analyzes the present situation and existing problems of AC /DC integrated power system in UHV Liantang substation,mainly including the automatic power switching,startup,continuous power supply and reliability and security issues. By comparing with the AC /DC power system of 500 kV substation,it introduces the main characteristics of AC /DC integrated power system in UHV substation,and based on the system characteristics and structure mechanism,it expounds the superiority and reliability of the designed AC /DC integrated power system in UHV substation.
出处 《华东电力》 北大核心 2014年第9期1766-1773,共8页 East China Electric Power
关键词 特高压变电站 交直流一体化电源系统 可靠 UHV substation AC /DC integrated power system reliability
  • 相关文献

参考文献9

二级参考文献40

共引文献288

同被引文献34

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部