期刊文献+

基于故障树(FTA)方法的二次系统项目评估方法研究 被引量:4

Project Evaluation Method for Secondary System Based on FTA
原文传递
导出
摘要 为降低电力二次系统安全风险整体水平,实现智能电网条件下电力系统高效运行,对电力二次系统项目后评估进行了研究。分别从二次设备和自动化系统及通信系统两方面梳理了影响二次系统可靠性的各因素,综述了各因素的作用形式和对一次系统的影响,建立了二次系统项目后评估可靠性指标体系。基于提出的指标体系,对二次系统项目整体评估进行了研究,建立了继电保护系统失效故障树图,提出了基于故障树(FTA)及动态故障树(DTA)的评估方法。 In order to reduce the overall level of the power secondary system security risks,and realize the efficient operation of smart grid,the post-project evaluation of power secondary system is studied. This paper summarizes various influencing factors of the secondary system reliability from the secondary equipment,automation system and communication system respectively,as well as the function mode of each factor and their influence on the primary system;then it establishes the post-project reliability evaluation index system. thereupon,overall evaluation is researched,formulates the fault tree graph of relay protection system,and finally proposes the evaluation method based on fault tree analysis( FTA) and dynamic fault tree analysis( DTA).
作者 王洪飞 施绮
出处 《华东电力》 北大核心 2014年第12期2747-2750,共4页 East China Electric Power
关键词 二次系统 二次设备 自动化系统 通信系统 故障树 动态故障树 secondary system secondary device automation system communication system fault tree dynamic fault tree
  • 相关文献

参考文献4

二级参考文献62

共引文献141

同被引文献45

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部