摘要
详细介绍了淮沪煤电田集电厂1、2号机组协调控制系统优化工作的主要工作内容和优化后的效果。项目团队通过几年持续的努力,使机组的控制系统涵盖了机、炉优化的成果,以及运行的要求,并最终使这两台机组的变负荷性能达到了电网和电厂均比较满意的效果。
This paper describes the main tasks and effects of the coordinated control system optimization of generating unit 1 and 2 in Huai-Shanghai Tianji Power Plant. Tthrough a few years' continuous efforts,the project team has optimized the control system of generating units,covering machines and furnaces,and finally made the variable load performance of the two units fit the power grid and power plant.
出处
《华东电力》
北大核心
2014年第12期2946-2949,共4页
East China Electric Power
关键词
优化
协调
变负荷性能
optimization
coordination
variable load performance