谈核电厂抗震裕度分析中抗震能力的走访 被引量:1

Seismic Capability Walkdown in Seismic Margin Assessment of Nuclear Power Plant
原文传递
导出
摘要 走访在核电厂的抗震裕度分析(SMA)中占据了重要的位置。讨论了走访在SMA中能够解决的最直接的问题,并对整个走访流程进行了描述,包括走访前的准备工作、走访过程以及对几类主要设备的走访方针进行了描述。给出了作者对于高效率完成走访工作的设想。 The seismic capability walkdown is very important in the seismic margin assessment of nuclear power plants.This paper discussed the problem that the walkdown can solve directly.Also this paper described the flow of walkdown,including the seismic capability preparatory work and walkdown process,and described the walkdown guidelines for several kinds of equipment.Lastly,the author gave the envision of achieving the walkdown with high efficiency.
作者 弓振邦 陈丽
出处 《核动力工程》 EI CAS CSCD 北大核心 2014年第S1期142-144,共3页 Nuclear Power Engineering
关键词 走访 抗震裕度分析 筛选 Walkdown,Seismic margin assessment(SMA),Screening
  • 相关文献

同被引文献37

  • 1蔡逢春,叶献辉,刘文进.核电厂构筑物和设备高置信度低失效概率抗震能力值的计算方法[J].核动力工程,2013,34(S1):152-156. 被引量:7
  • 2International Atomic Energy Agency. Evaluation of seismic safety for existing nuclear installations [ R]. IAEA, Vienna, Austria, IAEA Safety Standards Series No. NS-G-2.13,2009.
  • 3Kennedy R P, Campbell R D, Kassawara R P. A seismic margin assessment procedure[J]. Nuclear Engineeringand Design, 1988, 107(1): 61-75.
  • 4Campbell R D, Hardy G S, Ravindra M K, et al. Seismic re-evaluation of nuclear facilities worldwide : Overview and sta- tus[J]. Nuclear Engineering and Design, 1998, 182(1): 17-34.
  • 5Electric Power Research Institute. A methodology for assessment of nuclear power plant seismic margin [ R]. EPRI-NP- 6041,1991.
  • 6Budnitz R J, Amico P J, Cornell W J, et al. An approach to the quantification of seismic margins in nuclear power plants[R]. Lawrence Livermore National Lab., CA (USA), NUREG/CR-4334,1985.
  • 7Prassinos P G, Ravindra M K, Savy J B. Recommendations to the nuclear regulatory commission on trial guidelines for seismic margin reviews of nuclear power plants [ R]. Lawrence Livermore National Laboratory, NUREG/CR-4482, 1986.
  • 8Amico P J. An approach to the quantification of seismic margins in nuclear power plants: The importance of BWR plant systems and functions to seismic margins [R]. U.S. Nuclear Regulatory Commission, NUREG/CR-5076, 1988.
  • 9Prassinos P G, Murray R C, Cummings G E. Seismic margin review of the Maine Yankee atomic power station[ R]. Law- rence Livermore National Laboratory, NUREG/CR-4826, UCID-20948, 1987.
  • 10Electric Power Research Institute. Seismic margin assessment of the Catawba nuclear station [R]. NP-6359, 1989.

引证文献1

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部