摘要
针对台山核电厂先进压水堆(CEPR)核电机组电气、仪控及部分核岛工艺系统的初步试验阶段存在的问题,结合调试总体计划及调试前提条件,分析台山核电厂总体调试潜在的风险,给出预防措施及应对方案,以减少这些风险对调试总体计划的影响。
Considering the problems in the preliminary test stages for the process systems of electrical, instrumentation and control and part of the nuclear island in Taishan CEPR NPP, combined the overall commissioning schedule and prerequisites, the potential risk during commissioning phase is analyzed, and the measures to reduce the effect of these risks on the overall commissioning schedule are provided.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2015年第S1期37-39,共3页
Nuclear Power Engineering
关键词
调试
计划
风险
Commissioning,Schedule,Risk