摘要
台山核电厂采用CEPR三代核电技术,其中包括先进数字化仪控(DCS)和诸多新技术改进。针对这一特点,台山核电厂CEPR全范围模拟机(FSS)采用了下述解决方案:综合应用仿真和虚拟模拟技术路线,适应DCS数据库调试和更新过程;反应堆物理采用分析程序COX3D,计算燃料组件内注量率分布,实现对自给能堆内核测系统的高逼真度模拟;开发模拟机DCS初始工况维护工具软件;采用多信号集成监控系统对学员运行操作有效监控。
A third generation NNP technology, CEPR, is adopted in Taishan Nuclear Power Plant with the advanced digital control system(DCS) and other new techniques. Corresponding new features have developed for CEPR FSS. A combined using of DCS simulation and emulation is adopted for DCS database evolution. Core model COX3 D which calculates neutron flux distribution inside each assembly is used to improve fidelity of SPND simulation. A DCS initial condition maintenance tool was developed for DCS database tuning and updating. An integrated FSS monitor system has been built for effective monitor of trainee's operation activities.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2015年第S1期67-70,共4页
Nuclear Power Engineering