水下终端管汇结构设计 被引量:8

原文传递
导出
摘要 流花19-5气田位于南海珠江口盆地,平均深水约181m,是我国南海近年来又一例采用水下生产系统方案开发的海上油气田。该项目主要的水下结构物包括一个水下终端管汇(PLEM)及一个水下脐带缆终端(SUTU),本文主要对该项目PLEM结构的设计方法及设计经验进行了总结,供后续项目参考。
作者 张晖
机构地区 中海油研究总院
出处 《中国石油和化工标准与质量》 2013年第14期63-65,共3页 China Petroleum and Chemical Standard and Quality
  • 相关文献

参考文献4

  • 1张瑾,谢毅.深水水下管汇安装方法研究与进展[J].海洋工程,2011,29(1):143-148. 被引量:29
  • 2Petroleum and natural gas industries—Design and operation of subsea production systems - Part 1: General requirements and recommendations. ISO 13628-1 . 2005
  • 3.Recommended Practice for Planning,Designing and Construction Fixed Offshore Platforms–Working Stress Design[].API RPAst Edition.
  • 4.Environmental Contitions and Environmental Loads[].DNV RP-C.

二级参考文献10

  • 1Stephen j Rowe, Brain Maehenzie, Richard Snell. Deepwater installation of subsea hardware[C]///Proceedings of the lOth OffshoreSympositml. 2001.
  • 2F E Roved, L V S Sagrilo, E C P de Lima, et al. Comparing measured and calculated folrces of a manifold deployment in 940 meters water depth[C]//ASME 2003 22nd International Conference on Offshore Mechanics and Arctic Engineering. 2003:189-195.
  • 3F E Roveri, M C de Oliveira, M J Moretti. Installation of a production manifold in 2000 ft water depth offshore Brazil[C]//Offshore Technology Conference. 1996 : 10. 4043/8237-ms.
  • 4aPedro F K Stock, Maxwell B de Cerqueira, Francisco E Roveri. A new method for deploying subsea hardware in deep water[C] //Proceedings of the 2002 Deep OiIshore Teehnology. 2002,.
  • 5Jose Mauricio T G Lima, Mariele Lima Kuppens, Paulo Ferreira da Silveira, et al. Development of subsea facilities in the Roncador field[ C ]//Of/shore Technology Conference. 2008 : 10. 4043/19274-ms.
  • 6Pedro F k Stock, Mariele L Kuppens, Joao Luis b da Silva, et al. Roncador manifolds installation by the Pendulous method[C]//Preceedings of the 2007 Deep Offshore Technology. 2007.
  • 7F E Roveri, R D Machado, P F K Stock, et al. The unilization of the pendulous motion for deploying subsea hardware in ultra-deep water[ C]//Preceedings of the 2005 Deep Offshore Technology. 2005.
  • 8T Risoey, H Mork, H Johnsgard, et al. The pencil buoy method-a subsurface transportation and installation method[C]//Offshore Technology Conference. 2007.
  • 9"Pencil Sharp" solution for subsea installation[ED/OL]. http://www, akersolutions, cony/.
  • 10David Sinclair, Kenneth Aarset. Wet-tow installation: an alternative to conventional heavy-lift methods[ED/O]. http://www, subsea7. eom, 2009-05.

共引文献30

同被引文献60

  • 1李敏风.重防腐涂料的涂装施工(1)[J].现代涂料与涂装,2006,9(12):57-60. 被引量:1
  • 2[2]GB 50017-2003,钢结构设计规范[S].北京:中国计划出版社,2003.
  • 3廖红建,赵树德,等.岩土工程测试.北京:机械工业出版社.2007.
  • 4高静坤,郭庆.深水工程的防沉板设计[J].中国造船,2007,48(B11):25-30. 被引量:2
  • 5Prandt L,Uber P E. Zeitschrift fur Angewandte[J] Mathematic and Mechanic,1921,1(1):15-20.
  • 6Skempton A W. The bearing capacity of clays[C]. London:Building Research Congress,1951:180-189.
  • 7Meyerhof G G. The ultimate bearing capacity of foundations[J]. Géotechnique,1951,2(2):301-332.
  • 8Hansen B,Christensen N H. Discussion on theoretical bearing capacity of very shallow footings[J]. Journal of the Soil Mech and Found,1969,95(6):1568-1572.
  • 9Davis E H,Booker J R. The bearing capacity of strip footings from the standpoint of plasticity theory[C]. Melbourne:1st Australia-New Zealand Conference on Geomech,1971:276-282.
  • 10American Petraleum Institute. Recommended practice for planning,designing and constructing fixed offshore platforms[M]. American:API Recommended Practice (RP2A-WSD),2000:69-71.

引证文献8

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部