8WOLNY S, SCHIFFNER G, et al. Coiled tubing fracturing increases deliverability, recoverable reserves, and NPV of infill development wells in a mature shallow gas field [ R ]. SPE 77 679, 2002.
9SURJAATMADJA J B. Subterranean formation fracturing methods[P]. U.S. Patent No. 5 765 642, 1998.
10SURJAATMADJA J B, GRUNDMANN S R, et al. Hydrajet fracturing: an effective method for placing many fractures in openhole horizontal wells [ R ]. SPE 48 856, 1998.