4STEVEN F,ADRIANO C.The use of multilateral well designs for improved recovery in heavy oil reservoirs[R].SPE 112638,2008.
5Schlumberger Limited.Drilling industry articles[EB/OL].[2009-04-30].http://www,slb.com/content/services/resources/articles/drilling,asp?.
6SPEARS & ASSOCIATES,INC.Drilling and production outlook 2008[R/OL].2009-03[2009-04-30].http://www.spearsresearch,com.
7KABIR M,INGHAM S,SIBLEY D,et al.Application of a maximum reservoir contact (MRC) well in a thin,carbonate reservoir in Kuwait[R].SPE 100834,2006.
8SALAR B,HANI Q.Reservoir candidate screening is critical to ensure successful application of under balanced drilling technology-case study[R].SPE 105448,2007.