期刊文献+

LNG加气站用小型撬装式BOG再液化装置的研制开发 被引量:10

Small scale BOG re-liquefaction system in skid-mounted in LNG filling station
下载PDF
导出
摘要 针对陆上LNG加气站和LNG运输槽车的BOG放散所造成的燃料损失和环境污染等问题,以大功率脉管制冷机为冷源研发了一套小型撬装式BOG再液化装置。在LNG加气站对该小型撬装式BOG再液化装置进行了试运行实验,装置具有较好的稳定性、可靠性和安全性。实验结果表明:装置的净制冷功率至少达到550 W@120K,BOG的液化能力达到106kg·d-1。 Mainly for the problems such as fuel waste and environmental pollution resulted from BOG release of LNG filling stations and LNG tank vehicles,a small scale BOG re-liquefaction equipment in skid-mounted package has been designed and produced based on a high power PTC(Pulse Tube Cryocooler).Field experimental tests have been conducted to the small scale BOG re-liquefaction equipment,it is proved that the equipment can work with good stability,reliability and safety.It is showed from the experimental results that the net cooling capacity of the equipment is at least 550 W@120Kand its BOG re-liquefaction ability is as high as 106kg·d-1.
出处 《化工学报》 EI CAS CSCD 北大核心 2015年第S2期325-331,共7页 CIESC Journal
基金 上海市虹口区科学技术委员会产学研平台项目(14HKC03)~~
关键词 天然气 BOG 液化 回收 LNG加气站 撬装式 大功率制冷机 natural gas BOG liquefaction recovery LNG filling station skid-mounted high power pulse tube cryocooler
  • 相关文献

参考文献10

  • 1巨永林,郝熙欢,祝铁军.小型撬装式液化天然气蒸发气再液化回收装置的安装结构[P]. 中国专利:CN103759497A,
  • 2巨永林,郝熙欢,祝铁军.小型撬装式液化天然气蒸发气再液化回收无泵循环方法[P]. 中国专利:CN103759498A,
  • 3巨永林,郝熙欢,祝铁军,李海冰.小型撬装式液化天然气蒸发气再液化回收装置[P]. 中国专利:CN103759496A,
  • 4Boumedienne M. Beladjine,Ahmed Ouadha,Lahouari Adjlout.Performance Analysis of Oxygen Refrigerant in an LNG BOG Re-liquefaction Plant[J]. Procedia Computer Science . 2013
  • 5E. Querol,B. Gonzalez-Regueral,J. García-Torrent,M.J. García-Martínez.Boil off gas (BOG) management in Spanish liquid natural gas (LNG) terminals[J]. Applied Energy . 2010 (11)
  • 6BP Statistical Review of World Energy. http://124.205.69.136/files/51940000001AEDB3/www.bp.com/content/dam/bp/pdf/Energy-economics/statistical-review-2014/BP-statistical-review-of-world-energy-2014-fullreport.pdf . 2014
  • 7Gerdsmeyer K D,Isalski W H.On-board reliquefaction for LNG ships. Proc.of the Gas Processors Association Europe Conference . 2005
  • 8Mabuchi Nobuhiro.BOG Reliquefactionwith Cold Energy Storage and Utilization of LNG Cold Energy UsingCascade Process. Energy and Resources . 2006
  • 9Engdahl G E.Boil-off gas condensing assembly for use with liquid storage tanks. US 2008 /0034769A1 . 2008
  • 10Moon J W,Lee Y P,Jin Y W,et al.Cryogenic refrigeration cycle for re-liquefaction of LNG boil-off gas. The Cryostar Magazine . 2007

共引文献2

同被引文献95

引证文献10

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部