摘要
针对资源整合矿井煤炭采出作业较为复杂的问题,以科兴南阳煤业兼并重组整合矿井投产达效后的3208工作面为例,结合3号煤层的特点,进行回采工作面的设计、设备的选型及施工工艺的分析,经过这些设计,使该矿达到百万吨矿井回采工作面的生产要求,为类似情况提供技术经验借鉴。
Based on the complicated mining problem of resources integrated mine,Kexing Nanyang Mine,as integrated mine after put into production,its 3208 working face was taken as an example,combined with No.3 coal seam geological feature,the stopping working face design was conducted,equipment selection and construction technology were analyzed to achieve million tons of mine production requirement,which provided technical reference and expierence for similar condition.
出处
《煤炭与化工》
CAS
2014年第5期101-103,共3页
Coal and Chemical Industry
关键词
综采工作面
回采工艺
设备选型
fully mechanized working face
stopping technology
equipment selection