摘要 针对阳泉煤业集团某矿的立井施工实际工况,设计了与矿井条件相匹配的吊盘,通过分析吊盘所承受的负载条件,应用有限元强度分析方法,对吊盘的强度进行分析。在有限元分析结果的基础上找到吊盘结构中的薄弱环节,对吊盘的结构参数以满足强度和质量最小为目标进行改进分析,分析结果为吊盘样机的制作提供理论参考。 Based on actual working conditions of mine shaft construction in a coal mine of Yangquan coal industry group,the matching hanging scaffold was designed and its strength was researched through analysis of loading conditions of the hanging plate and application of finite element strength analysis method. The vulnerable spot of tray structure was obtained and structural parameters of the tray were improved to meet requirements of minimum intensity and quality, which provided a theoretical reference for manufacture of hanging disk prototype.
作者 王春斌
出处 《煤炭与化工》 CAS 2017年第6期24-26,共3页 Coal and Chemical Industry
关键词 立井施工 吊盘 有限元法 shaft construction hanging scaffold finite element method
  • 相关文献

参考文献4

二级参考文献19

  • 1董方庭.井巷设计与施工[M].徐州:中国矿业大学出版社,2004.
  • 2王新敏.ANSYS工程结构数值分析[M]北京:人民交通出版社,2007.
  • 3周 宁.ANSYS-APDL高级工程应用实例分析与二次开发[M]北京:中国水利水电出版社,200763-98.
  • 4陶柏祥;李和群;胡学文.建井工程结构[M]北京:煤炭工业出版社,1993207-239.
  • 5王启广;叶平.现代设计理论[M]徐州:中国矿业大学出版社,2005.
  • 6王介峰.凿井工程图册(第一分册)[M].北京:煤炭工业出版社,2012:192-192.
  • 7崔云龙.建井工程手册(一)[M].北京:煤炭工业出版社,2003:314-314.
  • 8中国工程建设标准化社会组织.GB50017--2003铜结构设计规范[M].北京:中国建筑工业出版社,2013:12-12.
  • 9田德文.立井井筒装备施工吊盘布置方式探讨[J].煤炭技术,2009,28(8):175-177. 被引量:3
  • 10高运强.超大直径立井凿井吊盘设计与施工[J].山东煤炭科技,2010,28(5):25-26. 被引量:6

共引文献7

同被引文献12

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部